Been a Softplan user since V5.0. However there is a simple command I use on another CAD package I can't seem to find here. "Copy to layer". ie, I wish to copy an item from an E-layer (Existing) to a D-Layer (Demo), yet keep the original on the E layer. Basically I want to copy the plumbing fixtures to the demo plan, then move them to the A-layer (New Architectural) to show we are demo'ing existing then replacing with new.
Most likely something right under my nose, but I'm missing it.
Thank you much.
Neil Paquette
CHD