In SP 2018 every time i put in a slab it assigned a different a level. I would auto trace basement slab and it would be Level1. I would trace my porch slab and it would automatically go to level 2. In SP 2020 all slabs are assigned the same level. Why the change SP?
Slab
Started by
Allen McDonnell
, Apr 11 2019 08:21 AM
1 reply to this topic
0 user(s) are reading this topic
0 members, 0 guests, 0 anonymous users