Thoughts Anyone ;
Currently working with a builder who uses a base plans with several different exteriors for the same floor plan.
Builder would like to make changes to the base plan as needed for customers and have all changes reflected
on the new plan set. The question would be, what would be the easiest and afford the lowest margin of error to
implement the changes with the options being; 1) Using the building options feature and custom visibility when
generating the revised plan set, or 2) leaving the default base plan intact and then doing a save project as ( New
Customers Name) and make the changes within the newly assigned project keeping the base plan unchanged.
My concern is the possible designation of building options and layers being assigned to the drawings which may
effect the base plans future accuracy if using the Building Options approach.