Area schedule- right click 'regenerate' missing?


  • Please log in to reply
10 replies to this topic

#1 Paul James

Paul James

    Advanced Member

  • Members
  • PipPipPip
  • 251 posts

Posted 15 June 2021 - 04:32 PM

Is this an error, or is there a reason for it being removed?



#2 JEREMY MILLER

JEREMY MILLER

    Member

  • Members
  • PipPip
  • 25 posts
  • LocationColumbus, OH

Posted 16 June 2021 - 08:12 AM

Can you provide a screen shot?


Heather Baldwin, AIBD, CPBD

heather@baldwinlakedesigns.com

(801) 652-3117 Cell

 


#3 Bill Wimberley

Bill Wimberley

    Advanced Member

  • Members
  • PipPipPip
  • 466 posts
  • LocationSan Angelo, TX

Posted 16 June 2021 - 08:37 AM

Right click regenerate has been removed for all schedules. Drives me insane because I am constantly regenerating schedules and removing right click regenerate only causes extra work.


  • Jim Johnson, Rick Kingsbury and Denis Reis like this

#4 Denis Reis

Denis Reis

    Advanced Member

  • Members
  • PipPipPip
  • 88 posts

Posted 17 June 2021 - 02:45 PM

Right click regenerate has been removed for all schedules. Drives me insane because I am constantly regenerating schedules and removing right click regenerate only causes extra work.

Same here....I've sent in a request to bring it back....hopefully they do



#5 Chris Proost

Chris Proost

    Advanced Member

  • Members
  • PipPipPip
  • 139 posts
  • LocationRichmond, VA

Posted 18 June 2021 - 09:58 AM

Just hit cleanup, that will update the schedule.



#6 Bill Wimberley

Bill Wimberley

    Advanced Member

  • Members
  • PipPipPip
  • 466 posts
  • LocationSan Angelo, TX

Posted 20 June 2021 - 02:58 PM

Just hit cleanup, that will update the schedule.

Unfortunately, nope. Cleanup does clean some things up in schedules but only a Regenerate will take care of all items in the schedule. Regenerate is essential and I never send out a drawing without regenerating all schedules. If cleanup could regenerate a schedule there would be no need to have the Regenerate button in the schedule properties.


  • David Zawadzki likes this

#7 Brent Hyndman

Brent Hyndman

    Advanced Member

  • Members
  • PipPipPip
  • 1,549 posts

Posted 21 June 2021 - 08:32 AM

The schedules now stay up to date live. Regenerate didn't do anything because of the live update technology. The regenerate button on the edit dialog is for regenerating if you change the options of the schedule. 
If you have a case where the live update isn't working properly and gives the wrong answer we would very much like to analyze it so that we could fix the problem if there is one.


#8 Bill Wimberley

Bill Wimberley

    Advanced Member

  • Members
  • PipPipPip
  • 466 posts
  • LocationSan Angelo, TX

Posted 21 June 2021 - 11:15 AM

Hey Brent. There are numerous cases I can cite but can't demonstrate because they are not apparent until I do a regenerate. For example, adding items to the drawing and even though they may show up in the schedule they are not sorted properly. A regenerate properly sorts the items. Copying items from one drawing to another, or perhaps it is merging drawings, will often not show the added items until a regenerate. Renumbering ceiling joists requires a regenerate to show the changes in the schedule. See the attachment. A cleanup did not resort the joists. I always regenerate to be absolutely sure that the schedules are correct. Always. And removing the right click regenerate only makes this process more difficult.

Attached Files


  • Jim Johnson and Rick Kingsbury like this

#9 Brent Hyndman

Brent Hyndman

    Advanced Member

  • Members
  • PipPipPip
  • 1,549 posts

Posted 23 June 2021 - 12:48 PM

Thanks  for the explanation Bill. The issue has been reported.



#10 Bill Wimberley

Bill Wimberley

    Advanced Member

  • Members
  • PipPipPip
  • 466 posts
  • LocationSan Angelo, TX

Posted 15 July 2021 - 02:53 PM

The latest patch broke sorting for ceiling framing schedules completely. Even a regenerate will not sort correctly any more. 
 

Attached Files



#11 Bill Wimberley

Bill Wimberley

    Advanced Member

  • Members
  • PipPipPip
  • 466 posts
  • LocationSan Angelo, TX

Posted 10 August 2021 - 08:58 AM

The latest patch added in "Reset to default sort order" which appears to clean up the sort order for schedules.

 