Break
Height option added to control how much Stair is shown before the break happens.
Hide Lines option added to remove the lines above the Break.
Landings
Finish options added to Landings.
Move
Align to Edge tool can be used to move a Railing to the side of a Stair.
Newel
Newel Post extends above the Railing at turns by default.
Excited to see movement in this direction. I have been hoping to see SoftPlan be able to make this basic stair set wet the varied but common railing types:
http://ljsmith.com/default.aspx?category=9&page=74
Even though some of the parts shown are out of style it is important to be able to produce this type of handrail system.
much of the design work from our office are high end and more stair custom abilities are needed, as are roofs. Glad to see improvements and hope more will follow
It would be really great if the railing that is hosted on the stairs would be hidden above the break as well when the stairs is. Otherwise I find there are always 2 railings on top of each other.