I was wondering if anyone has any idea's on how to speed up 3D adjustments with the roof on? My PC, is more then powerful enough.
After the process of elimination I've determined as soon as the roof is on the house wall, window and deck adjustments slow down
to about 7 seconds. Especially if the roof is on the 2nd floor and I have a multi floor roof. Solids, post and symbols adjust instantly.
Doesn't matter what 3D mode, mode options. Its just the roof!
If I remove the roof with Building Options the wall adjustments are again instant.
Thanks!